Skip to content

Pools and lanes

A pool is the boundary of one process. A lane is a band inside a pool that groups its elements — by who does the work, by department, by system, by whatever the diagram needs to make visible.

What you see on the canvas

  • The pool is the wide rectangle around the diagram, labelled with the process name at the top, for example Invoice Approval Process.
  • A lane is a horizontal or vertical band inside it, with its label written along the edge. Drawing User and Supervisor lanes puts the tasks of each under its own heading.
  • Tasks, gateways and events sit inside a lane, so moving a task between lanes moves it between responsibilities on the drawing.

The label of a pool or a lane is edited on the canvas, like any other element.

Lanes do not assign work

This is the part that surprises people: a lane is organisation for the reader, not an assignment rule.

  • A task in the Supervisor lane is not assigned to supervisors because of the lane.
  • Moving a task into a lane changes the picture, not who receives the case.
  • Assignment comes from the task itself: its assignment rules decide users and groups, and process access decides who may start the process.

So a diagram whose lanes look right can still route every case to the wrong person, and a diagram with no lanes can route perfectly. When something is assigned wrong, look at the task, not at the lane.

Pools and other processes

A second pool means a separate process, usually owned by someone else. Two things follow:

  • Inside one pool, elements connect with sequence flows. Across pools they do not: the connection is a message flow, drawn as a dashed line.
  • A pool can be drawn as a black box: just the outline, no elements inside. It says “this process exists and we exchange messages with it”, without pretending to know its internals.

In the product, the exchange itself is a message event and a message type: the diagram shows the intent, the message carries the data.

When lanes help, and when they lie

Use lanes for Avoid them for
Making responsibility readable at a glance Enforcing permissions — they do not
Grouping by area, shift, region or system Replacing assignment rules
Showing hand-offs between teams Implying a task is “owned” by a lane

A good test: hide the lanes and read the diagram. If the flow still makes sense and the task assignments are unchanged, the lanes were doing their job as documentation.